hongkongfoam

Hongkongfoam

Physically cross-linked foam

Physically cross-linked foam is produced through advanced technology. It is one of subcategories of cross-linked foams. It has superior physical properties and sophisticated dimensional stability. With electron beam process the product is extruded. And it is done through additives. The mechanical properties of this foam are retched up through dilatation. This yields a foam with Physically cross-linked foam

Chemically Cross-linked foam

Today many industries demand foam products with properties such as flexibility, durability and resistance against water and lightness and sound insulation. Chemically cross-linked polyethylene is a product which girds in all of these desired properties. It can be delivered in various shapes for different usages. in the following we will get familiar with different aspects Chemically Cross-linked foam

Cross-Linked PE 170-240

Foam Code : Cross-Linked PE 170 – 240

PRICE /SHEET: $15 – $25

DENSITY: 170 to 240 Kg/.m³

HARDNESS (SHORE A): 40

APPLICATIONS: variable

MOQ (SHEET): variable

LEAD TIME: Lead Time: 10-20 Business Days

COLOR: Black or Charcoal

Cross-Linked PE 120-170

Foam Code : Cross-Linked PE 120 – 170

PRICE /SHEET: $12 – $15

DENSITY: 120 to 170 Kg/.m³

HARDNESS (SHORE A): 50

APPLICATIONS: Electronics

MOQ (SHEET): CONTAINER

LEAD TIME: 10-15 DAYS

COLOR: Black or Colored

Cross-Linked PE 70-120

Foam Code : Cross-Linked PE 70 – 120

PRICE /SHEET: $10 – $12

DENSITY: 70-120 Kg/.m³

HARDNESS (SHORE A): 40

APPLICATIONS: variable

MOQ (SHEET): variable

LEAD TIME: 10-20 Business Days

COLOR: Black or Charcoal

EPDM Foam 180

EPDM 180

DENSITY: 180 Kg/.m³

HARDNESS (SHORE A): 28

APPLICATIONS: OIL INDUSTRY

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 175

EPDM foam 175

DENSITY: 175 Kg/.m³

HARDNESS (SHORE A): 20

APPLICATIONS: AVIATION INDUSTRY

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 160

EPDM foam 160

DENSITY: 160 Kg/.m³

HARDNESS (SHORE A): 20

APPLICATIONS: CONSTRUCTION

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 150

EPDM foam 150

DENSITY: 150 Kg/.m³

HARDNESS (SHORE A): 18

APPLICATIONS: CONSTRUCTION

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 145

EPDM foam 145

DENSITY: 145 Kg/.m³

HARDNESS (SHORE A): 18

APPLICATIONS: HVAC

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 140

EPDM foam 140

DENSITY: 140 Kg/.m³

HARDNESS (SHORE A): 18

APPLICATIONS: HVAC

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

EPDM Foam 130

EPDM foam 130

DENSITY: 130 Kg/.m³

HARDNESS (SHORE A): 15

APPLICATIONS: TAPES & STRIPES

MOQ (SHEET): Negotiable

LEAD TIME: 7-10 DAYS

COLOR: BLACK

Call Back

We will respond and call you as soon as possible

  • This field is for validation purposes and should be left unchanged.